网曝门 logo
网曝门鈥檚 Brown Stadium set for $5 million renovation

Published April 20, 2017

网曝门鈥檚 storied Brown Stadium will soon receive some long-awaited loving care.听听听

听听听听

The University of Louisiana System Board of Supervisors on Thursday gave approval for 网曝门 to renovate Brown Stadium, including construction of a new track and soccer field at 340 Warhawk Way.听

听听听听

鈥淚mprovements to Brown Stadium and Groseclose Track are long overdue,鈥 网曝门 President Dr. Nick Bruno said. 鈥淭hese improvements will provide multiple benefits to our teams, the community and the region.鈥澨

听听听听

网曝门 Facilities, Inc., will administer the project, with its anticipated cost of approximately $5 million.听

听听听听

鈥淲e鈥檒l have revenues that come from a couple of different sources,鈥 网曝门FI president Scott McDonald said. 鈥淚t comes from some auxiliary money, primarily some student money we have available to us and we bonded out and paid for it over a period of time.听

The Monroe/West Monroe Convention and Visitors Bureau made a very sizable and generous contribution.听鈥淥bviously that track serves as a community asset. You see people running, jogging and walking out there all the time.听听It will continue to serve the community as well as the athletic teams.鈥

听听听听

Bruno said, 鈥淐ontributions by the Convention and Visitors Bureau confirm the potential impact as is experienced by the softball complex.鈥

听 听听

New offices for track and soccer coaches, locker rooms, equipment storage areas and public restrooms will all be part of the planned first-floor improvements. The press box will be renovated and overall exterior aesthetics and the parking lot will see improvements too.听

听听听听

网曝门 is aiming to complete the project by the spring of 2018.听

sample
An architectural rendering (top) of what the University of Louisiana Monroe鈥檚 Brown Stadium will look like when renovations are complete in the spring of 2018 and what the stadium looks like today (bottom). 网曝门 Photo Services

听听听听

鈥淲e鈥檒l start almost immediately on the track surface because we want to have it ready as quickly as we can,鈥欌 McDonald said. 鈥淭hen it will go in phases from there.鈥澨

听听听听

Originally erected as a Works Progress Administration project for $45,000 in 1938, Brown Stadium stood across the bayou as home to the football team for nearly three decades. As the campus expanded, the university relocated the steel-frame structure to its current location in 1967. The relocation contract of March 15, 1966 included building a new track.听

听听听听

鈥淚t鈥檚 good to be able to have some buildings that have some history and were built right where you can go in and renovate them and bring them back to their original glory, as opposed to knocking things down and building something new,鈥 McDonald said. 鈥淭hat鈥檚 the old lion of the whole complex. It鈥檚 the last facility on that side of the bayou that we haven鈥檛 addressed from an improvement standpoint. I鈥檓 probably as excited about this as I have been anything in a long time.鈥

听听听听

The football program continued to utilize Brown until Malone Stadium opened in 1978. Although the men鈥檚 and women鈥檚 track teams have called the facility home for 50 years, there have been no major renovations to the building since its relocation.听

听听听听

鈥淲hen (athletic director) Brian Wickstrom came in, one of his priorities was getting us a track,鈥 网曝门 track and field coach J.D. Malone said. 鈥淚鈥檓 very excited. It鈥檚 going to be a game-changer for us.鈥

听听听听

Malone said it had been four years since 网曝门 played host to a home meet at Groseclose Track.听

听听听听

鈥淚 remember when we had home meets and it always seemed like we had a lot of personal records and good performances,鈥 Malone said. 鈥淚t just makes sense. Kids want to perform well on their home track. That鈥檚 another thing I鈥檓 looking forward to.鈥

听听听听听

The women鈥檚 soccer program made its debut in 1999 at Brown Stadium and played seven seasons there. The team moved to the 网曝门 Soccer Complex next to The Grove in 2006 but will regain a lighted field and other improved amenities.听

听听听听

鈥淚 am very excited about the direction this program is heading and the facility upgrades we are receiving,鈥 网曝门 soccer coach Keyton Wheelock said. 鈥淭he possibility of playing night matches will give us an opportunity to increase attendance and involvement of the community.鈥

听听听听

The defunct 网曝门鈥檚 men鈥檚 soccer team also played on the field at Brown Stadium from 1979-85.

听 听听

Through time, Brown Stadium served as the primary stage for a rich array of legendary performers.听

听 听听

Louisiana Sports Hall of Fame track coach Bob Groseclose and former football coach and Heisman Trophy winner John David Crow called the venue home. Joe Profit, the first African-American to play football for a predominantly white university in Louisiana, played his career there. Later on, future Olympian Breaux Greer threw the javelin for 网曝门 on the same grounds.

听听听听

Even the visitors list is notable. Opposing football teams brought future NFL quarterbacks Roger Staubach and Terry Bradshaw to Brown Stadium.听

听听听听

鈥淭here were some great players for then-Northeast and the teams that came in,鈥 McDonald said. 鈥淥ur own Joe Profit, our only first-round draft pick, played there. Obviously Coach Groseclose and that track program, with people like John Pennel and the Styron twins from track and field. All those great track teams trained out there and used that dressing room.

鈥淲hen I got to 网曝门 in the fall of 1978, Brown Stadium served as the baseball team鈥檚 dressing room. It has served as a facility for a lot of teams and a lot of great players. It hosted a lot of great moments out there for football and track. Even men鈥檚 soccer played on that field.鈥澨

听听听听

网曝门鈥檚 commitment to preserve the facility means that student-athletes will continue adding chapters to Brown鈥檚 lore for years to come.听

听听听听

鈥淚 am excited for our student-athletes, coaches and community about this project,鈥 网曝门 Athletic Director Brian Wickstrom said. 鈥淲e have been working on making this project a reality the last four years.听听I want to thank the donors who have made commitments to the project, the students, the Convention and Visitors Bureau and a special thanks to Dr. Bruno for working with us to help get this facility approved and underway. 鈥

Brown Stadium renovation project schedule

  • 网曝门 facilities signs contract with architect, March 24, 2017
  • Architectural and engineering begin design phase, April 1, 2017
  • Receive ULS Board approval, April 20, 2017
  • Design complete, Aug. 1, 2017
  • Design review period Aug. 1-Aug. 14, 2017
  • Project out for bidding, Aug 15, 2017
  • Bidding closes, Sept 15, 2017
  • Contract phase, Oct 1, 2017
  • Begin construction, Oct. 1, 2017
  • End construction, May 1, 2018
  • Grand opening, May 18, 2018听